Road Marking Paint and Machine Manufacturer
+86-15668659958
Road Marking Paint and Machine Manufacturer
+86-15668659958
Establishing a cooperative relationship with hot-melt road marking paint manufacturers is a crucial step in ensuring the smooth progress and quality of engineering projects. This is not merely a procurement activity but also a process of selecting long-term, stable technical and product support partners. Leveraging extensive industry experience, TOP ROAD Traffic Technology Co., Ltd. has compiled key considerations when seeking collaboration, aiming to help you build a smooth, reliable, and mutually beneficial partnership.
Enterprise Qualifications and Historical Verification: Confirm whether the manufacturer possesses legal production and operation qualifications, relevant industry certifications (such as quality management system certifications and environmental protection certifications), and honorary qualifications (such as high-tech enterprise status and credit rating certificates). Additionally, evaluate its years of industry experience and specialization, as companies with long-standing dedication to the marking field typically exhibit greater product stability and problem-solving expertise.
Production and Supply Capacity Assessment: Understand the scale, modernization level, and production capacity layout of their manufacturing bases. Whether they can establish production bases or warehouses in multiple regions across the country directly impacts the timeliness and stability of supply, particularly when dealing with large-scale projects or urgent replenishment needs.
Assessment of Technical and R&D Capabilities: Inquire whether the company possesses a professional R&D team and laboratory. Strong R&D capabilities indicate that the manufacturer can not only provide standardized products but also address special requirements, make formula adjustments, and continuously iterate and upgrade products.
Market Reputation and Case References: Gain insights into its market standing through industry channels and focus on reviewing its participation in typical engineering project cases, particularly successful ones similar to your project type, as these serve as direct proof of its capabilities.

Marking machine professional manufacturer
Marking machine professional manufacturer
Mobile : 0086 15668659958
E-mail:export@toproadtraffic.com
Website:www.toproadtraffic.com
Address:No. 6 Xinlin North Road, Changxing , Zhejiang
Toproad Traffic Facility Inc.
TOPROAD TRAFFIC FACILITY INC.Marking machine professional manufacturer
TOPROAD TRAFFIC FACILITY INC.
Hot melt marking machine
Operating instructions
pendant
Discharge chute
Marking hopper
Double sower
Paint bucket
Crank handle
Material door handle
Handrail
Wire hose
Product parameter
Product name
Net weight
Overall size
Glass microbead storage box
Adjustable glass bead double broadcast stand
Insulated bucket
Marking hopper
Rubber wheel
localizer
Scribing width
Hot melt hand push double spreader marking machine
Double stainless steel thermal insulation heating, double stainless steel bottom, capacity 100KG, upright manual mixing device, bucket body removable design.
Synchronous clutch broadcast, with speed shift device, adjustable width 50-200 mm, 300-450 mm.
High precision super bag material manufacturing, scraper structure, the use of a single scribing bucket handle,
the knife does not leak material, marking edge, end and end, uniform thickness.
Aluminum alloy wheel, special heat-resistant rubber, the rear wheel is equipped with a locator to ensure that the straight line.
The rear wheel is equipped with a positioner to ensure that you walk in a straight line or turn freely.
Standard is 150 mm, 50/100/150/200/250/300/400/450 mm different specifications, according to the engineering requirement changing line and different glass bead area.1
2
3
4
5
6
7
8
Upon receiving the equipment, please install the armrest bracket. If not, we will provide an operation video.
Before using the machine, please mix the road marking paint with an appropriate amount of diluent and stir evenly and
smoothly
Put the mixed paint bucket into the designated position of the marking machine, then insert the suction pipe and reflux
pipe.Before each use, please apply a few drops of lubricating oil to the position of the plunger rod
Turn on the power switch, and at this time, the reflux pipe will return to discharge for about 10 seconds. Close the reflux
valve, and you will see a pressure display. The conventional set pressure value is between 10-18 megapascals, and
the pressure regulating valve is located below the power switch, with a black knob.
Adjust the spray width to adjust the height of the spray gun holder, and adjust the pointer to around 25 square tubes.
Left hand pull line control for positioning straight lines and turns, right hand pull line control for switch guns.
After using the machine, the power switch must be turned off first, and then the diluent must be replaced for cleaning,
just like operating paint.
We provide detailed operation videos.
Attention: Do not start the machine when it is empty. Before starting the machine, the suction pipe
must be inserted into the liquid, otherwise the sealing ring may be damaged. If the machine is not
used for half a month, please fully charge it first, then open the battery cover and remove all the
positive wires on the sixth battery to prevent the battery from running out of power and starving to
death due to prolonged use.
1
2
3
4
5
6
7
8
Operating instructions
Marking machine professional manufacturer
TOPROAD TRAFFIC FACILITY INC.
03
04
Product parameter
Product name
Net weight
Scribing thickness
Scribing speed
Illumination
Pump casing
Endurance
Power
Overall size
Electric cold spray marking machine
Electric cold spray marking machine
Spray width
Flow rate
Working pressure
Steering cable
Pull a gun
Voltage regulator tube
floodlight
Steering wheel
injector
Spray gun
True air wheel
pointer1
2
3
4
5
6
7
8
9
10
11
12
Please install the armrest, connect the wiring and pipelines, and install the spray gun on the gun rack.
Please add an appropriate amount of diluent to the prepared paint and stir with an electric mixer until the paint
becomes smooth. Apply a few drops of the lubricating oil we have prepared to the position of the plunger rod.
Place the paint bucket on the marking machine and add gasoline to the gasoline engine (the engine oil has been added
before leaving the factory)
Place the suction and return pipes into the paint bucket and start the gasoline engine (Before starting, the reflux valve
needs to be in the open state, and the operating switch needs to be in the closed state.)
Adjust the throttle of the gasoline engine to around medium speed to ensure sufficient power generation.
Turn on the operation switch and observe whether the paint discharge from the reflux pipe is normal. After 10 seconds
of paint discharge, close the reflux valve.
Pay attention to the pressure gauge at this time. We adjust the pressure through the pressure knob on the panel and
set the pressure to around 13 megapascals.
Adjust the gun holder square tube and extend it outward until the spray gun position exceeds the rear large wheel to
prevent the rear wheel from pressing the line.
Prepare a ruler and use your right hand to pull the line to control the shooting. Measure the width of the sprayed mark
ing with the ruler and adjust it up and down with the clamp to control the spray width. After setting it, tighten the clamp
and adjust the pointer left and right to align the marking to the left, center, and right. The specific position of the marking
depends on the position of your waterline.
When painting, walk in a straight line and do not grab the brake handle with your left hand. After positioning and clamping,
push both hands forward directly. If encountering a turn, grab the brake handle with your left hand to complete the turn.
After the construction is completed, please turn off the running switch on the gasoline engine or panel to ensure that
the plunger rod is not moving. Remove the paint bucket and replace it with a thinner bucket. Prepare at least half of the
bucket, and clean it just like the previous operation of the paint until all the paint is washed out. The discharged paint
can be returned to the paint bucket without waste, and the spray gun can be removed for manual spraying.
For the first maintenance of a gasoline engine, the cumulative working time is 50 hours to change the oil. After that, the
oil change time is 200 hours, and the air filter is regularly cleaned.
Attention: Do not start the machine when it is empty. Before starting the machine, the suction pipe
must be inserted into the liquid, otherwise the sealing ring may be damaged.
1
2
3
4
5
6
7
8
9
10
11
12
Operating instructions
Marking machine professional manufacturer
TOPROAD TRAFFIC FACILITY INC.
05
06
Product parameter
Product name
engine
Plunger pump
working pressure
Filter
Pointer
Spray thickness
Overall dimensions
Power
Mechanical plunger cold spray marking machine
Mechanical plunger cold spray marking machine
Traffic
Spray width
Lighting
Working pressure
Voltage regulator length
Weight
Throttle cable
control panel
Shooting line
Pressure gauge
Steering cable
filter
Stabilizing tube
Reflux valve
Reflux pipe
Suction tube
Plunger pump
Spray gun
injector
Positioning wheel
laser
LED lighting
gasoline engine1
2
3
4
5
6
7
Add gasoline, add an appropriate amount of diluent to the prepared paint and stir thoroughly to make the paint bucket
smooth, then put it into the machine.
Insert the suction pipe into the bottom of the paint bucket, and also put the reflux pipe into the paint bucket. Open the
reflux valve and start the gasoline engine. Pay attention to observing the discharge of the reflux pipe for about 8
seconds. Close the reflux valve, and at this time, the pressure gauge will display the pressure. Set the pressure to
8-12mpa for single gun operation, and 15mpa for double gun operation.
Now adjust the throttle of the gasoline engine again to minimize the vibration point of the spray gun, which is the
optimal throttle position.
The spray gun switch is pulled on the right-hand side and controlled by the left-hand side for turning.
The method of adjusting the spraying width is to adjust the height of the spray gun holder, and the pointer can be
adjusted left and right.
Flashing lights, lighting fixtures, and laser control switches are located on the panel.
The first maintenance of the gasoline engine has a cumulative working time of 50 hours to change the oil, and the
subsequent oil change time is 200 hours. Regularly clean the air filter
Attention: The suction pipe of the machine must not leave the liquid during operation, otherwise
the suction air entering the pump body may cause damage to the sealing ring. If not in use for a
long time, please use a diluent to wash the paint clean.
1
2
3
4
5
6
7
Operating instructions
Product parameter
Product name
Engine
Dash width
Number of spray guns
Voltage regulator length
LED lighting
Hydraulic oil tank
Filter
Power
Scribe thickness
Spray flow rate
Working pressure
Net weight
Alarm lamp
Plunger pump
Pointer
Hydraulic plunger marking machine
Hydraulic plunger marking machine
Overall dimensions
Marking machine professional manufacturer
TOPROAD TRAFFIC FACILITY INC.
07
08
Steering wheel 转向轮
Steering cable 转向拉线
Spray gun cable 喷枪拉线
Paint plunger pump 油漆柱塞泵
回流阀
Reflux valve
警灯
Warning lights
汽油机
gasoline engine
Hydraulic oil plunger pump 液压油柱塞泵
LED灯
LED lights
injector 喷嘴
Spray gun 喷枪
调压阀
Pressure regulating
valve
Stabilizing tube 稳压管
过滤器
filterProduct parameter
Product name
Engine
Plunger pump
Overall size
Power
Spray flow
Air compressor
Voltage regulator tube
weight
Spray width
Two component marking machine pneumatic glass bead spraying
Two component marking machine pneumatic glass bead spraying
Glass bead jar capacity
Working pressure
Marking machine professional manufacturer
TOPROAD TRAFFIC FACILITY INC.
09
10
Two component marking machine glass bead self falling type
Product parameter
Product name
Overall size
Two component marking machine glass bead self falling type
Engine
Plunger pump
Power
Spray flow
Voltage regulator tube
Spray width
Working pressure
weight
Glass bead box capacity
Spreader1
2
3
4
5
6
7
Install the pendant and hang the ball head, locking it with the locking pin.
Before leaving the factory, we add engine oil and hydraulic oil, and users only need to add gasoline.
There is a hydraulic return valve screw on the oil pump, which can be tightened before operation.
The seat can be adjusted forward or backward.
After starting the gasoline engine, we can control forward and backward movement through the foot pedal.
After the construction is completed, the connection of the power bike can be removed, the screw of the hydraulic return
valve can be loosened, and the power bike can be pushed by hand.
The first maintenance of the gasoline engine has a cumulative working time of 50 hours to change the oil, and the
subsequent oil change time is 200 hours. Regularly clean the air filter.
2
3
4
5
6
Operating instructions
Hydraulic plunger marking machine
Marking machine professional manufacturer
TOPROAD TRAFFIC FACILITY INC.
11
12
Product parameter
Product name
Engine
Overall size
Warning light
Oil pump
Power
Connectable
Power
Top speed
weight
Hydraulic moped
Steering cable
Steering cable
Steering cable
Steering cable
Steering cable
Steering cable
Steering cable
Vacuum air wheel
Steering cable1
2
3
4
5
6
After connecting the power bike, connect the plug and air duct. The power bike can be started electrically (by adjusting
the air door) or manually. Please add gasoline to the white bucket
After confirming that the blade is off the ground, electrically start the GX690 engine (increase the throttle after starting,
and also push the accelerator pedal of the power bike). After pressing the armrest with both hands, slowly lower the
cable with your right hand and release it.
Press the up and down keys with your right thumb and tap to adjust the depth of the blade, which can achieve the
desired effect.
Regularly clean the recycling bin and filter element during construction.
Before stopping the machine, press the armrest with both hands and lift the blades off the ground.
The first maintenance of the gasoline engine has a cumulative working time of 50 hours to change the oil, and the
subsequent oil change time is 200 hours. Regularly clean the air filter.

Our company is a professional manufacturer of road hot-melt coatings, road retroreflective measuring instruments, and road marking machines. If you are interested, please feel free to communicate with me via email at any time export@toproadtraffic.com
Operating instructions
Product parameter
Product name
Engine
Overall size
Blade
Depth
Depth
Moped
Power
Life
weight
690 wire removal machine
690 wire removal machine
Marking machine professional manufacturer
TOPROAD TRAFFIC FACILITY INC.
13
14
engine
filter element
Steering cable
Dust collector
Recycling bucket
Steering positioning wheel
tool carrier
tank1

Our company is a professional manufacturer of road hot-melt coatings, road retroreflective measuring instruments, and road marking machines. If you are interested, please feel free to communicate with me via email at any time export@toproadtraffic.com
Before leaving the factory, we have added engine oil and hydraulic oil, and the user adds diesel. The two ends of the
knife holder are filled with butter, and the oil filter is filled with an appropriate amount of engine oil.
Before starting, confirm that the clutch is in a disengaged state, push the push rod of the directional valve to the middle
position (neutral), and lift the blade off the ground.
The diesel engine can be started either electrically or manually (After starting, increase the throttle)
Kick the clutch lever to the left position, push the reversing valve stem upwards to move the equipment forward.
Adjust the lifting rod to slowly land the blade and start removing the thread.
Before the construction is completed, the blade should be off the ground, the reversing valve push rod should be
pushed to the middle position, and the clutch rod should be kicked to the right.
The diesel engine has been working for a total of 50 hours, and the oil should be replaced every time for 200 hours.
The oil filter oil should be replaced every day.
1
2
3
4
5
6
7
Operating instructions
Product parameter
Product name
Overall dimensions
Diesel engine
Clearing speed
Stripe width
Depth of
delineation
Weight
Number of blades
Walking system
Power
Blade material
Blade lifespan
Small wire removal machine
Wire removal machine
Marking machine professional manufacturer
TOPROAD TRAFFIC FACILITY INC.
15
16
Diesel engine
Reversing valve stem
Oil filter
Tool carrier
Oil pump
Clutch
Hydraulic motor
Throttle
Lifting rodProduct parameter
Product name
Engine
Spray gun holder
Wind turbine
Positioning wheel
Safety pressure control
Maximum pressure
Wind power
Funnel
Net weight
Overall dimensions
Tyre
Spray width
Hair dryer and bottom oil integrated machine
Product parameter
Product name
Engine
Scribe thickness
Dash width
Scoring speed
Power
Spray flow rate
Net weight
Overall dimensions
Working pressure
High pressure pipe length
Marking machine professional manufacturer
TOPROAD TRAFFIC FACILITY INC.
17
18
Hair dryer and bottom oil integrated machine
Enhanced version cold spray marking machine
Enhanced version cold spray marking machine
Positioning wheel
Air outlet
Storage tank
Shooting line
Refueling port
blast pump
gasoline engine
gasoline engine
Diaphragm pump
Reflux pipe
Suction tube
Reflux valve
Pressure regulating
valve
Positioning wheel
Stabilizing tube
Shooting handle
Steering cable
Spray gun

Our company is a professional manufacturer of road hot-melt coatings, road retroreflective measuring instruments, and road marking machines. If you are interested, please feel free to communicate with me via email at any time export@toproadtraffic.com