Road Marking Paint and Machine Manufacturer

+86-15668659958

Precautions for Cooperation with Hot-Melt Marking Paint Manufacturers

30 12 月, 2025

Establishing a cooperative relationship with hot-melt road marking paint manufacturers is a crucial step in ensuring the smooth progress and quality of engineering projects. This is not merely a procurement activity but also a process of selecting long-term, stable technical and product support partners. Leveraging extensive industry experience, TOP ROAD Traffic Technology Co., Ltd. has compiled key considerations when seeking collaboration, aiming to help you build a smooth, reliable, and mutually beneficial partnership.

  1. Due Diligence Before Cooperation: In-depth Understanding of Potential Partners
    A comprehensive understanding of potential manufacturers is crucial before formal cooperation.

Enterprise Qualifications and Historical Verification: Confirm whether the manufacturer possesses legal production and operation qualifications, relevant industry certifications (such as quality management system certifications and environmental protection certifications), and honorary qualifications (such as high-tech enterprise status and credit rating certificates). Additionally, evaluate its years of industry experience and specialization, as companies with long-standing dedication to the marking field typically exhibit greater product stability and problem-solving expertise.
Production and Supply Capacity Assessment: Understand the scale, modernization level, and production capacity layout of their manufacturing bases. Whether they can establish production bases or warehouses in multiple regions across the country directly impacts the timeliness and stability of supply, particularly when dealing with large-scale projects or urgent replenishment needs.
Assessment of Technical and R&D Capabilities: Inquire whether the company possesses a professional R&D team and laboratory. Strong R&D capabilities indicate that the manufacturer can not only provide standardized products but also address special requirements, make formula adjustments, and continuously iterate and upgrade products.
Market Reputation and Case References: Gain insights into its market standing through industry channels and focus on reviewing its participation in typical engineering project cases, particularly successful ones similar to your project type, as these serve as direct proof of its capabilities.

Marking machine professional manufacturer

Marking machine professional manufacturer

Mobile : 0086 15668659958

E-mail:export@toproadtraffic.com

Website:www.toproadtraffic.com

Address:No. 6 Xinlin North Road, Changxing , Zhejiang

Toproad Traffic Facility Inc.

TOPROAD TRAFFIC FACILITY INC.Marking machine professional manufacturer

TOPROAD TRAFFIC FACILITY INC.

Hot melt marking machine

Operating instructions

pendant

Discharge chute

Marking hopper

Double sower

Paint bucket

Crank handle

Material door handle

Handrail

Wire hose

Product parameter

Product name

Net weight

Overall size

Glass microbead storage box

Adjustable glass bead double broadcast stand

Insulated bucket

Marking hopper

Rubber wheel

localizer

Scribing width

Hot melt hand push double spreader marking machine

Double stainless steel thermal insulation heating, double stainless steel bottom, capacity 100KG, upright manual mixing device, bucket body removable design.

Synchronous clutch broadcast, with speed shift device, adjustable width 50-200 mm, 300-450 mm.

High precision super bag material manufacturing, scraper structure, the use of a single scribing bucket handle,

the knife does not leak material, marking edge, end and end, uniform thickness.

Aluminum alloy wheel, special heat-resistant rubber, the rear wheel is equipped with a locator to ensure that the straight line.

The rear wheel is equipped with a positioner to ensure that you walk in a straight line or turn freely.

Standard is 150 mm, 50/100/150/200/250/300/400/450 mm different specifications, according to the engineering requirement changing line and different glass bead area.1

2

3

4

5

6

7

8

Upon receiving the equipment, please install the armrest bracket. If not, we will provide an operation video.

Before using the machine, please mix the road marking paint with an appropriate amount of diluent and stir evenly and

smoothly

Put the mixed paint bucket into the designated position of the marking machine, then insert the suction pipe and reflux

pipe.Before each use, please apply a few drops of lubricating oil to the position of the plunger rod

Turn on the power switch, and at this time, the reflux pipe will return to discharge for about 10 seconds. Close the reflux

valve, and you will see a pressure display. The conventional set pressure value is between 10-18 megapascals, and

the pressure regulating valve is located below the power switch, with a black knob.

Adjust the spray width to adjust the height of the spray gun holder, and adjust the pointer to around 25 square tubes.

Left hand pull line control for positioning straight lines and turns, right hand pull line control for switch guns.

After using the machine, the power switch must be turned off first, and then the diluent must be replaced for cleaning,

just like operating paint.

We provide detailed operation videos.

Attention: Do not start the machine when it is empty. Before starting the machine, the suction pipe

must be inserted into the liquid, otherwise the sealing ring may be damaged. If the machine is not

used for half a month, please fully charge it first, then open the battery cover and remove all the

positive wires on the sixth battery to prevent the battery from running out of power and starving to

death due to prolonged use.

1

2

3

4

5

6

7

8

Operating instructions

Marking machine professional manufacturer

TOPROAD TRAFFIC FACILITY INC.

03

04

Product parameter

Product name

Net weight

Scribing thickness

Scribing speed

Illumination

Pump casing

Endurance

Power

Overall size

Electric cold spray marking machine

Electric cold spray marking machine

Spray width

Flow rate

Working pressure

Steering cable

Pull a gun

Voltage regulator tube

floodlight

Steering wheel

injector

Spray gun

True air wheel

pointer1

2

3

4

5

6

7

8

9

10

11

12

Please install the armrest, connect the wiring and pipelines, and install the spray gun on the gun rack.

Please add an appropriate amount of diluent to the prepared paint and stir with an electric mixer until the paint

becomes smooth. Apply a few drops of the lubricating oil we have prepared to the position of the plunger rod.

Place the paint bucket on the marking machine and add gasoline to the gasoline engine (the engine oil has been added

before leaving the factory)

Place the suction and return pipes into the paint bucket and start the gasoline engine (Before starting, the reflux valve

needs to be in the open state, and the operating switch needs to be in the closed state.)

Adjust the throttle of the gasoline engine to around medium speed to ensure sufficient power generation.

Turn on the operation switch and observe whether the paint discharge from the reflux pipe is normal. After 10 seconds

of paint discharge, close the reflux valve.

Pay attention to the pressure gauge at this time. We adjust the pressure through the pressure knob on the panel and

set the pressure to around 13 megapascals.

Adjust the gun holder square tube and extend it outward until the spray gun position exceeds the rear large wheel to

prevent the rear wheel from pressing the line.

Prepare a ruler and use your right hand to pull the line to control the shooting. Measure the width of the sprayed mark

ing with the ruler and adjust it up and down with the clamp to control the spray width. After setting it, tighten the clamp

and adjust the pointer left and right to align the marking to the left, center, and right. The specific position of the marking

depends on the position of your waterline.

When painting, walk in a straight line and do not grab the brake handle with your left hand. After positioning and clamping,

push both hands forward directly. If encountering a turn, grab the brake handle with your left hand to complete the turn.

After the construction is completed, please turn off the running switch on the gasoline engine or panel to ensure that

the plunger rod is not moving. Remove the paint bucket and replace it with a thinner bucket. Prepare at least half of the

bucket, and clean it just like the previous operation of the paint until all the paint is washed out. The discharged paint

can be returned to the paint bucket without waste, and the spray gun can be removed for manual spraying.

For the first maintenance of a gasoline engine, the cumulative working time is 50 hours to change the oil. After that, the

oil change time is 200 hours, and the air filter is regularly cleaned.

Attention: Do not start the machine when it is empty. Before starting the machine, the suction pipe

must be inserted into the liquid, otherwise the sealing ring may be damaged.

1

2

3

4

5

6

7

8

9

10

11

12

Operating instructions

Marking machine professional manufacturer

TOPROAD TRAFFIC FACILITY INC.

05

06

Product parameter

Product name

engine

Plunger pump

working pressure

Filter

Pointer

Spray thickness

Overall dimensions

Power

Mechanical plunger cold spray marking machine

Mechanical plunger cold spray marking machine

Traffic

Spray width

Lighting

Working pressure

Voltage regulator length

Weight

Throttle cable

control panel

Shooting line

Pressure gauge

Steering cable

filter

Stabilizing tube

Reflux valve

Reflux pipe

Suction tube

Plunger pump

Spray gun

injector

Positioning wheel

laser

LED lighting

gasoline engine1

2

3

4

5

6

7

Add gasoline, add an appropriate amount of diluent to the prepared paint and stir thoroughly to make the paint bucket

smooth, then put it into the machine.

Insert the suction pipe into the bottom of the paint bucket, and also put the reflux pipe into the paint bucket. Open the

reflux valve and start the gasoline engine. Pay attention to observing the discharge of the reflux pipe for about 8

seconds. Close the reflux valve, and at this time, the pressure gauge will display the pressure. Set the pressure to

8-12mpa for single gun operation, and 15mpa for double gun operation.

Now adjust the throttle of the gasoline engine again to minimize the vibration point of the spray gun, which is the

optimal throttle position.

The spray gun switch is pulled on the right-hand side and controlled by the left-hand side for turning.

The method of adjusting the spraying width is to adjust the height of the spray gun holder, and the pointer can be

adjusted left and right.

Flashing lights, lighting fixtures, and laser control switches are located on the panel.

The first maintenance of the gasoline engine has a cumulative working time of 50 hours to change the oil, and the

subsequent oil change time is 200 hours. Regularly clean the air filter

Attention: The suction pipe of the machine must not leave the liquid during operation, otherwise

the suction air entering the pump body may cause damage to the sealing ring. If not in use for a

long time, please use a diluent to wash the paint clean.

1

2

3

4

5

6

7

Operating instructions

Product parameter

Product name

Engine

Dash width

Number of spray guns

Voltage regulator length

LED lighting

Hydraulic oil tank

Filter

Power

Scribe thickness

Spray flow rate

Working pressure

Net weight

Alarm lamp

Plunger pump

Pointer

Hydraulic plunger marking machine

Hydraulic plunger marking machine

Overall dimensions

Marking machine professional manufacturer

TOPROAD TRAFFIC FACILITY INC.

07

08

Steering wheel 转向轮

Steering cable 转向拉线

Spray gun cable 喷枪拉线

Paint plunger pump 油漆柱塞泵

回流阀

Reflux valve

警灯

Warning lights

汽油机

gasoline engine

Hydraulic oil plunger pump 液压油柱塞泵

LED灯

LED lights

injector 喷嘴

Spray gun 喷枪

调压阀

Pressure regulating

valve

Stabilizing tube 稳压管

过滤器

filterProduct parameter

Product name

Engine

Plunger pump

Overall size

Power

Spray flow

Air compressor

Voltage regulator tube

weight

Spray width

Two component marking machine pneumatic glass bead spraying

Two component marking machine pneumatic glass bead spraying

Glass bead jar capacity

Working pressure

Marking machine professional manufacturer

TOPROAD TRAFFIC FACILITY INC.

09

10

Two component marking machine glass bead self falling type

Product parameter

Product name

Overall size

Two component marking machine glass bead self falling type

Engine

Plunger pump

Power

Spray flow

Voltage regulator tube

Spray width

Working pressure

weight

Glass bead box capacity

Spreader1

2

3

4

5

6

7

Install the pendant and hang the ball head, locking it with the locking pin.

Before leaving the factory, we add engine oil and hydraulic oil, and users only need to add gasoline.

There is a hydraulic return valve screw on the oil pump, which can be tightened before operation.

The seat can be adjusted forward or backward.

After starting the gasoline engine, we can control forward and backward movement through the foot pedal.

After the construction is completed, the connection of the power bike can be removed, the screw of the hydraulic return

valve can be loosened, and the power bike can be pushed by hand.

The first maintenance of the gasoline engine has a cumulative working time of 50 hours to change the oil, and the

subsequent oil change time is 200 hours. Regularly clean the air filter.

2

3

4

5

6

Operating instructions

Hydraulic plunger marking machine

Marking machine professional manufacturer

TOPROAD TRAFFIC FACILITY INC.

11

12

Product parameter

Product name

Engine

Overall size

Warning light

Oil pump

Power

Connectable

Power

Top speed

weight

Hydraulic moped

Steering cable

Steering cable

Steering cable

Steering cable

Steering cable

Steering cable

Steering cable

Vacuum air wheel

Steering cable1

2

3

4

5

6

After connecting the power bike, connect the plug and air duct. The power bike can be started electrically (by adjusting

the air door) or manually. Please add gasoline to the white bucket

After confirming that the blade is off the ground, electrically start the GX690 engine (increase the throttle after starting,

and also push the accelerator pedal of the power bike). After pressing the armrest with both hands, slowly lower the

cable with your right hand and release it.

Press the up and down keys with your right thumb and tap to adjust the depth of the blade, which can achieve the

desired effect.

Regularly clean the recycling bin and filter element during construction.

Before stopping the machine, press the armrest with both hands and lift the blades off the ground.

The first maintenance of the gasoline engine has a cumulative working time of 50 hours to change the oil, and the

subsequent oil change time is 200 hours. Regularly clean the air filter.

Our company is a professional manufacturer of road hot-melt coatings, road retroreflective measuring instruments, and road marking machines. If you are interested, please feel free to communicate with me via email at any time export@toproadtraffic.com

Operating instructions

Product parameter

Product name

Engine

Overall size

Blade

Depth

Depth

Moped

Power

Life

weight

690 wire removal machine

690 wire removal machine

Marking machine professional manufacturer

TOPROAD TRAFFIC FACILITY INC.

13

14

engine

filter element

Steering cable

Dust collector

Recycling bucket

Steering positioning wheel

tool carrier

tank1

Our company is a professional manufacturer of road hot-melt coatings, road retroreflective measuring instruments, and road marking machines. If you are interested, please feel free to communicate with me via email at any time export@toproadtraffic.com

Before leaving the factory, we have added engine oil and hydraulic oil, and the user adds diesel. The two ends of the

knife holder are filled with butter, and the oil filter is filled with an appropriate amount of engine oil.

Before starting, confirm that the clutch is in a disengaged state, push the push rod of the directional valve to the middle

position (neutral), and lift the blade off the ground.

The diesel engine can be started either electrically or manually (After starting, increase the throttle)

Kick the clutch lever to the left position, push the reversing valve stem upwards to move the equipment forward.

Adjust the lifting rod to slowly land the blade and start removing the thread.

Before the construction is completed, the blade should be off the ground, the reversing valve push rod should be

pushed to the middle position, and the clutch rod should be kicked to the right.

The diesel engine has been working for a total of 50 hours, and the oil should be replaced every time for 200 hours.

The oil filter oil should be replaced every day.

1

2

3

4

5

6

7

Operating instructions

Product parameter

Product name

Overall dimensions

Diesel engine

Clearing speed

Stripe width

Depth of

delineation

Weight

Number of blades

Walking system

Power

Blade material

Blade lifespan

Small wire removal machine

Wire removal machine

Marking machine professional manufacturer

TOPROAD TRAFFIC FACILITY INC.

15

16

Diesel engine

Reversing valve stem

Oil filter

Tool carrier

Oil pump

Clutch

Hydraulic motor

Throttle

Lifting rodProduct parameter

Product name

Engine

Spray gun holder

Wind turbine

Positioning wheel

Safety pressure control

Maximum pressure

Wind power

Funnel

Net weight

Overall dimensions

Tyre

Spray width

Hair dryer and bottom oil integrated machine

Product parameter

Product name

Engine

Scribe thickness

Dash width

Scoring speed

Power

Spray flow rate

Net weight

Overall dimensions

Working pressure

High pressure pipe length

Marking machine professional manufacturer

TOPROAD TRAFFIC FACILITY INC.

17

18

Hair dryer and bottom oil integrated machine

Enhanced version cold spray marking machine

Enhanced version cold spray marking machine

Positioning wheel

Air outlet

Storage tank

Shooting line

Refueling port

blast pump

gasoline engine

gasoline engine

Diaphragm pump

Reflux pipe

Suction tube

Reflux valve

Pressure regulating

valve

Positioning wheel

Stabilizing tube

Shooting handle

Steering cable

Spray gun

Our company is a professional manufacturer of road hot-melt coatings, road retroreflective measuring instruments, and road marking machines. If you are interested, please feel free to communicate with me via email at any time export@toproadtraffic.com

NEED ANY ROAD MARKINGS INDUSTRY SOLUTIONS?