Road Marking Paint and Machine Manufacturer
+86-15668659958
Road Marking Paint and Machine Manufacturer
+86-15668659958
Construction steps of hot melt marking paint
1、Before road cleaning construction, clean the ground to remove dust, floating slurry, and moisture.
2、 Due to the fact that the hot melt marking coating construction is basically formed in one go, the route and pattern need to be marked before construction
3、 The conventional equipment for hot melt coating construction includes a hair dryer, a hot melt kettle, and a manual marking machine. Before marking, the coating needs to be placed in the hot melt kettle for heating and melting.
4、 After applying Huaxia Na coating and melting it, arrange the marking machine according to the layout line, and pour out the melted hot melt marking coating. At the same time, spread it on the coating film through a self weight glass bead spreader.
5、 After correcting the marking construction, it is necessary to make corrections before the hot melt coating is fully cured, remove the marking that does not meet the requirements, shovel off the spilled coating film, and check the size, thickness, and distribution of glass beads.