Road Marking Paint and Machine Manufacturer
+86-15668659958
Road Marking Paint and Machine Manufacturer
+86-15668659958
Table of Contents
1.Overview……………………………………………………………………………… 2
2. Main Functional Characteristics and Technical Parameters………..3
2.1 Main Functional Characteristics……………………………………….3
2.2 Main technical parameters……………………………………………….3
3. Introduction to Use ………………………………………………………………..5
4.TOPROAD Standard Warrant………………………………………………….7
11.Overview
Road marking is an essential aspect of traffic management, ensuring safety and
order on highways, parking lots, and other public spaces. The Plunger Pump Cold
Spray Line Marking Machine is a revolutionary tool designed to make this process
more efficient and precise.
The plunger pump cold spray marking machine has the advantages of
user-friendly design, high efficiency and precision, time saving, cost reduction and
simple operation.
22. Main Functional Characteristics and Technical Parameters
2.1 Main Functional Characteristics
1. High Efficiency and Precision
The Plunger Pump Cold Spray Line Marking Machine uses a high-pressure,
airless spraying system. This ensures that the paint lines are uniform, smooth,
and free of edges or gaps. The machine can adjust the spraying pressure and
width according to your needs, making it suitable for various line marking tasks.
2. User-Friendly Design
This machine is designed with the operator in mind. It features an ergonomic
control handle, adjustable spray gun bracket, and a front-mounted locking wheel
for easy maneuverability. The compact size and lightweight design make it easy
to transport and set up at different locations.
3. Cost-Effective and Durable
The machine uses a high-quality alloy plunger pump that provides consistent
performance and long-lasting durability. The hydraulic system is equipped with a
cooling fan and radiator to ensure stable operation even during prolonged use.
This reduces maintenance costs and downtime.
4. Versatility
34
Whether you need to mark parking lots, school zones, or highways, this
machine can handle it all. It is suitable for both small-scale projects and
large-scale operations.
5. Time-Saving
The machine significantly reduces the time required for line marking
compared to traditional methods.
6. Cost Reduction
By providing precise and uniform lines, it minimizes paint waste and reduces
overall project costs.
7. Ease of Operation
The machine is easy to use and requires minimal training for operators.
2.2 Main technical parameters
Product name
Mechanical plunger cold spray marking machine
Engine
Honda GX200
Power
6.5HP
Plunger pump
DAKIN, Japan
Traffic
6L
Working pressure
11-25mpa
Spray width
5-45cm
Filter
100 mesh filter
Lighting
LED
Pointer
Equipped with a laser
ten scale ruler
Working pressure
15m
Spray thickness
0.2-0.4mm
Voltage regulator length
Overall dimensions
1550×760×960mm
Weight
95Kg5
3. Introduction to Use
1.
Please install the armrest, connect the wiring and pipelines, and install
the spray gun on the gun rack.
2.
Please add an appropriate amount of diluent to the prepared paint and stir
with an electric mixer until the paint becomes smooth. Apply a few drops of the
lubricating oil we have prepared to the position of the plunger rod.
3.
Place the paint bucket on the marking machine and add gasoline to the
gasoline engine (the engine oil has been added before leaving the factory)
4.
Place the suction and return pipes into the paint bucket and start the
gasoline engine (Before starting, the reflux valve needs to be in the open state, and the
operating switch needs to be in the closed state.)
5.
Adjust the throttle of the gasoline engine to around medium speed to
ensure sufficient power generation.
6.
Turn on the operation switch and observe whether the paint discharge
from the reflux pipe is normal. After 10 seconds of paint discharge, close the reflux
valve.
7.
Pay attention to the pressure gauge at this time. We adjust the pressure
through the pressure knob on the panel and set the pressure to around 13 megapascals.
8.
Adjust the gun holder square tube and extend it outward until the spray
gun position exceeds the rear large wheel to prevent the rear wheel from pressing the
line.
9.Prepare a ruler and use your right hand to pull the line to control the shooting.Measure the width of the sprayed marking with the ruler and adjust it up and down
with the clamp to control the spray width. After setting it, tighten the clamp and adjust
the pointer left and right to align the marking to the left, center, and right. The specific
position of the marking depends on the position of your waterline.
10. When painting, walk in a straight line and do not grab the brake handle
with your left hand. After positioning and clamping, push both hands forward directly.
If encountering a turn, grab the brake handle with your left hand to complete the turn.
11. After the construction is completed, please turn off the running switch on
the gasoline engine or panel to ensure that the plunger rod is not moving. Remove the
paint bucket and replace it with a thinner bucket. Prepare at least half of the bucket,
and clean it just like the previous operation of the paint until all the paint is washed
out. The discharged paint can be returned to the paint bucket without waste, and the
spray gun can be removed for manual spraying.
12. For the first maintenance of a gasoline engine, the cumulative working
time is 50 hours to change the oil. After that, the oil change time is 200 hours, and the
air filter is regularly cleaned.
Attention: Do not start the machine when it is empty. Before starting the
machine, the suction pipe must be inserted into the liquid, otherwise the sealing
ring may be damaged.
64.TOPROAD Standard Warrant
TOPROAD warrants all equipment referenced in this document which is
manufactured by TOPROAD and bearing its name to be free from defects in material
and workmanship on the date of sale to the original purchaser for use. With the
exception of any special, extended, or limited warranty published by TOPROAD ,
TOPROAD will, for a period of twelve months from the date of sale, repair or replace
any part of the equipment determined by TOPROAD to be defective. This warranty
applies only when the equipment is installed, operated and maintained in accordance
with TOPROAD’s written recommendations.
This warranty does not cover, and TOPROAD shall not be liable for general wear and
tear, or any malfunction, damage or wear caused by faulty installation, misapplication,
abrasion, corrosion, inadequate or improper maintenance, negligence, accident,
tampering, or substitution of non-TOPROAD component parts. Nor shall TOPROAD
be liable for malfunction, damage or wear caused by the incompatibility of
TOPROAD equipment with structures, accessories, equipment or materials not
supplied by TOPROAD, or the improper design, manufacture, installation, operation
or maintenance of structures, accessories, equipment or materials not supplied by
TOPROAD.
This warranty is conditioned upon the prepaid return of the equipment claimed to be
defective to an authorized TOPROAD distributor for verification of the claimed
defect. If the claimed defect is verified, TOPROAD will repair or replace free of
charge any defective parts. The equipment will be returned to the original purchaser
transportation prepaid. If inspection of the equipment does not disclose any defect in
material or workmanship, repairs will be made at a reasonable charge, which charges
may include the costs of parts, labor, and transportation.
THIS WARRANTY IS EXCLUSIVE, AND IS IN LIEU OF ANY OTHER
7WARRANTIES, EXPRESS OR IMPLIED, INCLUDING BUT NOT
LIMITED TO WARRANTY OF MERCHANTABILITY OR WARRANTY OF
FITNESS FOR A PARTICULAR PURPOSE.
In no event will TOPROAD be liable for indirect, incidental, special or consequential
damages resulting from TOPROAD supplying equipment hereunder, or the furnishing,
performance, or use of any products or other goods sold hereto, whether due to a
breach of contract, breach of warranty, the negligence of TOPROAD, or otherwise.
Our company is a professional manufacturer of road hot-melt coatings, road retroreflective measuring instruments, and road marking machines. If you are interested, please feel free to communicate with me via email at any time export@toproadtraffic.com